Buying AI That Can Improve After the Contract Is Signed

At a Sri Lankan plant nursery a gardener hands a young jak sapling in a clay pot to a public officer, its healthy roots showing, while a bouquet of cut flowers wilts forgotten on the bench behind them.

AI, Human Agency and the Digital Economy · Part 23 of 41


I have written bids for software contracts, and I have lived with software contracts I did not write. Trouble starts in the document, long before it reaches the software.

A system that impressed everyone on demonstration day can be ordinary a year later, and nothing in the file says what to do about it. The specification quietly expired; the contract did not.

So, what do you write down at purchase, so that what you bought can get better, can still be checked, and can still be left? My answer: AI acquisition needs staged evidence, operating obligations and practical exit options.

What goes stale when you buy a demonstration?

Sri Lanka’s rules already treat information systems as a different kind of purchase. The Procurement Guidelines – 2024 — issued by the National Procurement Commission “in terms of Article 156c.(1) of the Constitution”, Gazette Extraordinary No. 2412/01 of 25 November 2024, in force from 1 January 2025, superseding the 2006 National Procurement Agency guidelines and their manuals and circulars — bind government institutions, not private buyers.

Where the subject is a “Complex Information System that is subject to rapid technological advances”, they allow a two-stage procedure: an unpriced first stage invited “on the basis of a conceptual design or performance specifications”, the documents then amended, priced proposals afterwards. That is staged evidence, written into the law — before award, and an option for complex cases rather than the normal route. What happens after award is still the contract’s job, and that is the rest of this article.

For some systems the specification cannot be trusted to hold through an ordinary competition. The same rules want specifications “objective, functional, and ‘fit for the purpose’” — though not without exception: for proprietary systems the procuring entity “shall define required products, their technical specifications, and service requirements”. But a model name is the most perishable thing in a specification.

What are you actually buying?

Not a model. An outcome, under continuing obligations, measured by tests you wrote before you saw anybody’s demonstration.

In complex system engineering procurements the bidder “undertakes the responsibility to design and build a system that reaches operational acceptance.” What that means for an AI service is left to the buyer to write down — the phrase appears once, undefined, its detail deferred to a manual.

An acceptance test is a check agreed in advance: real cases, a rule for what counts as a right answer, a signature when it passes. Representative carries the weight — the cases must stand for the work the service will really do, awkward ones included. A demonstration only has to be impressive once. An acceptance test says what the work has to be worth every time, and has you check it again next year.

Two guards, both mine. A test scored only by another model is not an acceptance test: a second model’s agreement is a review signal, not proof. And every evaluation names its reviewer and its record — cases, rule version, result, approver.

What has to be priced rather than assumed?

Five things get left to the imagination and return as a cost or a crisis: security, data handling, accessibility, support and total cost. For the first two, the UK National Cyber Security Centre’s cloud security principles give a non-vendor vocabulary — guidance, not law, not Sri Lankan policy: “all access to service interfaces should be constrained to a securely authenticated and authorised identity”.

For support and total cost, the UK Cabinet Office asks buyers to model “whole-life costs and risks associated with… set-up, operation and decommissioning” — policy, not law, not ours — and Sri Lanka’s own Value for Money clause says much the same: non-price attributes “and/or life cycle costs as appropriate”.

Accessibility has no backstop. Sri Lanka’s cross-sector instrument, the Disabled Persons (Accessibility) Regulations, No. 1 of 2006, covers the built environment; the words “website”, “online” and “digital” do not appear in it. The only live digital rule is a guideline: ICTA’s 2022 Guidelines for Developing Sri Lanka Government Websites 4.0, which requires government websites “to adhere to the Web Content Accessibility Guidelines (WCAG) version 2.1” while carrying a section headed “Exemptions to following accessibility standards”. No Sri Lankan law requires a digital service to be accessible. If it is not in your contract, it does not exist.

The table is an editorial example, not a legal template — my proposal, approved by nobody.

Criterion What a good answer looks like Ask a prospective supplier Evidence at acceptance
Service outcome Work to a stated standard, not a named model “Which outcomes are you measured on?” Signed results on the representative cases
Security, data handling Named controls for access, protection, erasure “Who reaches our data, how is it deleted?” Access model, data map, erasure steps
Accessibility A published target such as WCAG 2.2, gaps listed “Which criteria do you not meet?” A dated report, not a claim
Updates, re-evaluation Announced change, notice period, same cases re-tested “How do we hear before our users do?” Notice terms, re-evaluation schedule
Incident responsibility One accountable role each side, with a response time “Who answers when an output harms someone?” Named roles, escalation path, readable log
Whole-life cost Set-up, operation, support, decommissioning priced “What will year three cost, including leaving?” A cost model, exit included

Controlled updates, re-evaluation, and someone who answers

A service that can improve is one that can change without asking you first, and three clauses turn that from alarming into ordinary.

Controlled updates. Controlled does not mean frozen. It means announced, scheduled and reversible: notice before a change reaches your users, a window in which you can re-test, and a route back if the change makes your work worse. You are not asking a supplier to stop improving. You are asking not to find out from a citizen.

Re-evaluation. NIST’s AI Risk Management Framework — a voluntary US framework, not law anywhere, including in the United States — settles the cadence question: monitoring and periodic review of the risk process are planned, with roles and responsibilities defined, “including determining the frequency of periodic review.” Not “review it regularly”. Decide how often, and put the number in the contract. The same framework carries the clause most contracts lack: mechanisms and assigned responsibilities to override, suspend or withdraw AI systems whose performance proves inconsistent with intended use. If the re-evaluation fails, what happens, and who is permitted to switch it off?

Incident responsibility. The UK’s Algorithmic Transparency Recording Standard — public-sector guidance, in the UK only — exists to let senior responsible owners take “meaningful accountability”, and adds a detail worth borrowing: “The SRO should be a role title, not a named individual, for business continuity and security purposes.” People transfer; roles stay.

Then say what the role must do. NIST’s wording: “incidents and errors are communicated to relevant AI actors, including affected communities” — in a public service, that means the people the output was about. And the record has to be yours to read: in the NCSC’s phrasing, you “should be able to identify security incidents and should have the information necessary to find out how and when they occurred.”

One caution, and it is mine. A model’s generated reasoning is not an authoritative audit trail. An explanation the system produces about itself is not evidence. The record is sources, rule versions, actions, approvals and resulting state — written as the work happens, and readable without the supplier’s help.

What you can take with you

An earlier essay separated two decisions that get confused — leaving a supplier and retiring a service. This piece is about the clauses that make either executable.

The most detailed public drafting is the EU’s Data Act, which applies from 12 September 2025 to data processing services generally, and not in Sri Lanka. Its switching chapter obliges providers to remove the “pre-commercial, commercial, technical, contractual and organisational obstacles” that stop a customer leaving, then writes the practical parts into the contract: transition completed “not after the mandatory maximum transitional period of 30 calendar days”, with “reasonable assistance”, and the clause I would copy first — “an exhaustive specification of all categories of data and digital assets that can be ported”.

Nothing there obliges anyone to leave; it obliges leaving to be possible, described and priced. Four things make that real: the export format and its schedule, the documentation, ownership of your configuration — the rules, prompts and thresholds that make the service yours — and transition assistance while you move. Those four are where stable interfaces and portable records — the architecture I propose here, mine and not a standard — become clauses.

Phasing, and a renewal that is a decision

Buy the first period as the one in which you find out: a defined scope, the representative tests, the evidence you will need later. Then let renewal turn on what you learned, not the calendar — re-evaluation results, the incident log, the cost as it ran.

For a Sri Lankan public buyer the vehicles sit in the same instrument. Information systems are expressly in scope — the term covers ICT “regardless of the hardware/software supply or service components”. A “Framework Agreement” is defined as one that “establishes the terms and conditions which govern any contract awarded during the term of the said agreement”. And two-stage bidding, pre-award and an exception for complex, fast-moving systems rather than the ordinary route, stages the evidence at the front.

None of that tells you your own rules. A private buyer, a bank, a company board answers to something else, so the instruction stays modest: phased procurement and renewal decisions that fit applicable rules. This is not legal advice.

“But then how do we compare the bids?”

From the buyer’s side of the table I would raise this objection myself. A contract that can change after signature is unfair to the losing bidders and impossible to audit. We specify a fixed thing so bids are comparable.

I concede it entirely. Comparability and auditability are legal obligations, not bureaucratic habit, and open-ended discretion after award is improper. Sri Lanka’s guidelines put both halves in one sentence: value for money rests on non-price attributes “and/or life cycle costs as appropriate” and on “adherence to Procurement Processes based on fairness, integrity, equity, transparency, competitiveness, and accountability.” Life-cycle cost and fairness arrive in the same breath.

Comparability comes from every bidder being measured against the same representative acceptance tests — more comparable than competing demonstrations, not less. Auditability comes from re-evaluation results being recorded, not from the specification never changing. Flexibility specified in advance is not discretion. And proportion matters: a small pilot needs none of this.

Three limits. No Sri Lankan primary source exists for AI-specific acceptance, update or incident obligations; the frameworks above come from elsewhere, and none is law anywhere. I have no dated figure for how fast capability moves. Every “should” here is mine.

The thing worth carrying away

You are not buying a system. You are buying a relationship that must survive the system changing — obligations with dates, tests and names attached.

So, before the next signature, two questions. If the service is materially better in eighteen months, does your contract let you have the improvement? If it is worse, does it let you find out, say so, and go?

This is the twenty-third essay in a series asking how people, organizations and nations can turn increasingly capable AI into greater human capability, better services and sustainable economic opportunity. Part IV closes here.


Next in this series: A21 — When AI Gets Your Case Wrong, Who Puts It Right?

All essays in this series: AI, Human Agency and the Digital Economy

Sources

  • Procurement Guidelines – 2024 on Goods, Works, and Non-Consulting Services (Gazette Extraordinary No. 2412/01, 25 November 2024) — National Procurement Commission of Sri Lanka, made “in terms of Article 156c.(1) of the Constitution” (PDF, the Auditor General’s hosted copy of the Gazette). In force 1 January 2025; replaces and supersedes the Procurement Guidelines – 2006, Goods and Works of the National Procurement Agency “along with all related Procurement Manuals, Supplements, Circulars, and Instructions” — the 2006 instrument is not current law. Quoted above: §3.3.3(d)(iii) two-stage bidding for a “Complex Information System that is subject to rapid technological advances”; §5.23 specifications; §12.1 information-systems scope; §12.3 proprietary systems; §12.4 operational acceptance; §1.1 value for money; the Framework Agreement definition. Binds Sri Lankan government institutions procuring goods, works, non-consulting services and information systems; it does not bind private buyers. Two-stage bidding is a pre-award procedure and a permissive exception, not the default route. Operational detail is deferred throughout to an accompanying procurement manual, which is not quoted here.
  • Regulation (EU) 2023/2854 (the Data Act), Chapter VI — switching between data processing services — Article 23 on removing “pre-commercial, commercial, technical, contractual and organisational obstacles”; Article 25(2)(a) on the “mandatory maximum transitional period of 30 calendar days” and “reasonable assistance”; Article 25(2)(e) on “an exhaustive specification of all categories of data and digital assets that can be ported”. EU law, applying to data processing services generally from 12 September 2025. It is not Sri Lankan law and places no obligation on a Sri Lankan buyer or supplier.
  • AI Risk Management Framework 1.0 (NIST AI 100-1) — National Institute of Standards and Technology, January 2023 (PDF). GOVERN 1.5 on planned monitoring and review “including determining the frequency of periodic review”; MANAGE 2.4 on mechanisms and assigned responsibilities to “supersede, disengage, or deactivate” AI systems performing inconsistently with intended use; MANAGE 4.3 on incidents and errors “communicated to relevant AI actors, including affected communities”. A voluntary US framework. It is not law in the United States or anywhere else, and the contractual use made of it above is my proposal.
  • Algorithmic Transparency Recording Standard — guidance for public sector bodies — UK Government Digital Service and DSIT. Enables senior responsible owners to take “meaningful accountability”; “The SRO should be a role title, not a named individual, for business continuity and security purposes.” UK public sector guidance only.
  • The cloud security principles — National Cyber Security Centre (UK). Principle 10 on access “constrained to a securely authenticated and authorised identity”; Principle 13 on having “the information necessary to find out how and when” incidents occurred. UK national guidance, not law and not Sri Lankan policy; used here as a non-vendor vocabulary, with no provider named.
  • The Digital, Data and Technology Playbook — Cabinet Office (UK), updated 20 June 2023. Should Cost Models must cover “whole-life costs and risks associated with… set-up, operation and decommissioning”. UK public procurement policy, not law, and not Sri Lankan.
  • Disabled Persons (Accessibility) Regulations, No. 1 of 2006 — Sri Lanka (PDF). Covers public buildings and places: ramps, doorways, lifts, Braille plates, audio loops. A built-environment and physical-information instrument; the words “website”, “online” and “digital” do not appear in it, and it does not reach software or digital services.
  • Guidelines for Developing Sri Lanka Government Websites 4.0 — Information and Communication Technology Agency of Sri Lanka, 2022 (PDF). Developers of government websites “are required to adhere to the Web Content Accessibility Guidelines (WCAG) version 2.1”; the document also carries a section headed “Exemptions to following accessibility standards”. A guideline for government websites, not a statute, not about AI systems, and with the extent of compliance left to each organisation’s judgement.
  • Web Content Accessibility Guidelines (WCAG) 2.2 — W3C Recommendation, 12 December 2024. An international standard, referenced above only as an example of a published accessibility target in an evaluation matrix; it is not required by Sri Lankan law.